Designer shingle
- Roof colorWeathered wood
A layered section of the roof system you choose, labeled by component. Illustrative and not to scale.
For Pat Donnelly, Westerville, Ohio
A new roof, documented layer by layer.
Full roof replacement. Prices valid until December 14, 2026.
Read Gabe’s note
Pat, thanks for having me up on the roof on Friday and going through what we found together.
Below are three roof systems for a full tear-off, priced exactly for the 28 squares we measured. The drawing shows every layer that goes on, and the list under Only if we find it shows what we charge for problems that can only be seen once the old shingles are off. Nothing on that list is in your total.
Nothing here commits you. Send a request and I’ll walk you through color samples in daylight.
Gabe NovakProject consultant, Copperline Roofing
A layered section of the roof system you choose, labeled by component. Illustrative and not to scale.
Choose a roof system
- Covering
- Designer shingle, slate-like profile
- Underlayment
- Ice and water barrier at eaves and valleys, synthetic elsewhere
- Ventilation
- Ridge vent
- Look
- Thicker, slate-like
- Time on site
- 2 to 3 days
Why Gabe recommends it. It gives the slate look you mentioned for the front gable at about half the price of metal.
Color
Color chips are illustrations. We'll bring full-size samples so you can see them against your siding in daylight.
Ventilation, gutters and extras
Optional. Nothing here is added unless you choose it.
The details
The work
Every system starts with a complete tear-off to the deck, so we can inspect every sheet of decking before anything new goes on. Then the layers go back in order: ice and water barrier at the eaves and valleys, underlayment over the rest of the deck, drip edge, starter, the roof covering you choose, and a ridge vent at the peak. The systems differ in the covering on top.
What’s included
In every system
- Building permit and final inspection
- Full tear-off of one existing layer to the deck
- Deck inspection, with photos of anything that needs repair
- Ice and water barrier at eaves, valleys and around penetrations
- Synthetic underlayment over the rest of the deck
- New drip edge, starter and ridge cap
- Ridge vent with the existing soffit intake
- New pipe boots and step flashing
- Daily clean-up and a magnetic nail sweep of the yard and driveway
Not included
- Gutters (optional below)
- Siding, trim or fascia repair beyond the drip edge (fascia priced under Only if we find it)
- Interior repairs from past leaks
- Satellite dish removal and reinstallation
This price assumes
- One existing layer of shingles
- The roof area is about 28 squares
- The driveway is available for the dumpster during the job
Who handles what
| Item | Handled by | Details |
|---|---|---|
| Building permitWe apply and schedule the final inspection. | Copperline Roofing | We apply and schedule the final inspection. |
| HOA color approvalIf your HOA approves roof colors, please get approval before ordering. We'll provide product sheets. | You | If your HOA approves roof colors, please get approval before ordering. We'll provide product sheets. |
| Insurance claimsIf this is an insurance claim, you handle it with your insurer. This estimate is our price for the work. | You | If this is an insurance claim, you handle it with your insurer. This estimate is our price for the work. |
| Satellite dishArrange removal and reconnection with your provider. | You | Arrange removal and reconnection with your provider. |
| Attic storageCover stored items in the attic; tear-off loosens dust. | You | Cover stored items in the attic; tear-off loosens dust. |
| Nail clean-upDaily clean-up and a magnetic sweep of the yard and driveway. | Copperline Roofing | Daily clean-up and a magnetic sweep of the yard and driveway. |
Only if we find it
Not in your total. If we find one of these after tear-off, we photograph it, show you, and use these prices.
- Replace damaged roof deckingOnly if we find soft or rotted decking after tear-off. We photograph it and tell you before replacing.
- $95 per sheet
- Remove an additional shingle layerOnly if a second layer is found under the first.
- $65 per square
- Replace rotted fascia boardOnly where the fascia under the drip edge is rotted.
- $14 per linear ft
How the project runs
Start: Usually 2 to 4 weeks after approval, weather permitting.
Permit and materials
1 to 2 weeks
We pull the permit and schedule delivery for the morning of day 1.
Tear-off and deck inspection
Day 1
Old roofing comes off; we photograph and show you anything under Only if we find it.
Barrier and underlayment
Day 1 to 2
Ice and water barrier, underlayment and drip edge, so the roof is dry each night.
Roof covering
1 to 3 days
Shingles or panels, flashing and the ridge vent.
Clean-up and inspection
Last day
Magnetic sweep, gutters if added, and the final inspection.
Durations are Copperline Roofing’s estimates and can shift with weather and inspections.
About Copperline Roofing
Copperline Roofing is a fictional residential roofing company created to demonstrate QuoteStage. In a real estimate, this is where the contractor describes who they are, how long they've worked in the area and how they run a project.
- License
- Roofing contractor registration RC-DEMO-0000 (fictional number for demonstration)
- Insurance
- General liability and workers' compensation certificates available on request (demonstration text)
- Warranty
Sample warranty for the fictional demo company: 10-year workmanship warranty on the roof system we install. Product warranties are set by each manufacturer and depend on the products and registration; we'll give you the manufacturer's documents.
- Service area
- Franklin and Delaware counties, Ohio
Documents
As Copperline Roofing provided them.
- Certificate of insurance (sample)View Certificate of insurance (sample)
- Contractor license (sample)View Contractor license (sample)
Terms
- Prices valid until
- December 14, 2026
- Payment schedule
- 30% when materials are delivered
- 70% when the roof passes final inspection
- Changes after signing
- Anything found after tear-off is photographed and shown to you, then priced at the unit prices in this estimate. No other change is made without your written approval.
- Please note
Prices are for a full tear-off of one existing layer down to the deck. The roof area is from our roof measurement of about 28 squares (2,800 sq ft).
- About manufacturer warranties
Manufacturer warranty terms are set by each manufacturer and depend on the products installed and on registration. We'll give you the manufacturer's documents for the products we install. This estimate doesn't add to or change them.
Ready to go ahead?
Send your selections to Copperline Roofing. They'll contact you to confirm the details and prepare an agreement. Sending this doesn't commit you to anything.
You’re sending$22,800
Designer shingle package; Roof color: Weathered wood.