Signature
- CabinetsPainted white
- CountertopWhite quartz
- BacksplashWhite subway, 3 × 6 in
- HardwarePolished nickel
- FlooringNatural oak plank (luxury vinyl)
A kitchen elevation drawn from your selections. Layout and proportions are illustrative, not your design drawings.
For Avery Lindqvist, Littleton, Colorado
A kitchen that works as hard as you do, and looks finished doing it.
Kitchen renovation. Prices valid until December 14, 2026.
Read Paolo’s note
Avery, thank you for walking me through how you cook and entertain. It made the options below much easier to put together.
There are three levels of renovation, each priced exactly for the scope listed. The differences are spelled out side by side, including the allowances for fixtures you’ll choose in our showroom. Appliances aren’t in any price; you choose and buy those, and we install them.
Sending a request doesn’t commit you to anything. We’ll set up a design meeting and walk the showroom together.
Paolo BianchiProject designer, Ashgrove Kitchen & Bath
A kitchen elevation drawn from your selections. Layout and proportions are illustrative, not your design drawings.
Choose a renovation level
- Layout
- Reworked, with island
- Cabinetry
- Painted shaker with pantry cabinet
- Countertops
- Quartz
- Lighting
- Recessed and under-cabinet
- Range hood
- Your appliance hood
- Appliances
- Not included
- Construction
- About 6 weeks
Why Paolo recommends it. The island gives you the prep space and seating you asked for, and the lighting fixes the dark corner by the pantry.
Cabinets, counters and tile
Chips are illustrations. You'll choose from physical door, slab and tile samples in our showroom.
Lighting and fixtures
Optional. Nothing here is added unless you choose it.
The details
The renovation
Every level replaces the cabinets, counters, backsplash, sink and flooring, and brings the electrical and plumbing up to code where the work touches it. The levels differ in layout and how far the cabinetry goes: the existing footprint refreshed, a new island with seating, or full-height cabinetry with a custom hood.
What’s included
In every level
- Design meetings and final drawings
- Permits and inspections
- Demolition and disposal of the existing kitchen
- New cabinets, countertops, backsplash and sink
- New flooring in the kitchen and breakfast area
- Electrical and plumbing updates where the work requires them
- Installation of your appliances
- Daily clean-up and dust protection for the rest of the house
Not included
- Appliances (you purchase them; we install them)
- Work outside the kitchen and breakfast area
- Moving load-bearing walls
- Window replacement
This price assumes
- The existing subfloor is sound (repairs are priced under Only if needed)
- Plumbing and gas stay in their current locations unless the level you choose moves them
- You'll have selections finished within 3 weeks of the design meeting
Allowances in Signature
Budgets already inside the price for items you’ll choose later. They aren’t added to your total.
- Plumbing fixturesSink, faucet, disposal and prep sink
- $2,600
- Light fixturesPendants and fixtures you choose
- $1,800
Who handles what
| Item | Handled by | Details |
|---|---|---|
| Permits and inspectionsWe apply and are present for inspections. | Ashgrove Kitchen & Bath | We apply and are present for inspections. |
| AppliancesYou purchase them and have them delivered by the cabinet date; we install them. | You | You purchase them and have them delivered by the cabinet date; we install them. |
| SelectionsFinish cabinet, slab, tile and fixture choices within 3 weeks of the design meeting. | You | Finish cabinet, slab, tile and fixture choices within 3 weeks of the design meeting. |
| A temporary kitchenPlan for about 4 to 8 weeks without a working kitchen. | You | Plan for about 4 to 8 weeks without a working kitchen. |
| Dust protectionPlastic barriers and floor protection for the rest of the house. | Ashgrove Kitchen & Bath | Plastic barriers and floor protection for the rest of the house. |
Only if needed
These aren't in your total. They apply only if the condition is found, and we'll show you before doing the work.
- Subfloor repairOnly if damage is found after the old floor comes up. We'll show you first.
- $14 per sq ft
- Rerouting a hidden pipe or ductOnly if one is found in a wall we need to open.
- $650 each
How the project runs
Start: Demolition about 8 to 10 weeks after design approval, once cabinets are scheduled.
Design and selections
2 to 3 weeks
We finalize the layout and you choose cabinets, slab, tile and fixtures in our showroom.
Permit and ordering
6 to 8 weeks
We apply for the permit while cabinets are built.
Demolition
2 to 3 days
Dust protection goes up, and the old kitchen comes out.
Rough-in
About 1 week
Electrical and plumbing updates, then inspection.
Cabinets and counters
About 2 weeks
Cabinets are installed, counters templated and set.
Tile, lighting and appliances
About 1 week
Backsplash, fixtures and your appliances go in, then final inspection.
Durations are Ashgrove Kitchen & Bath’s estimates and can shift with weather and inspections.
About Ashgrove Kitchen & Bath
Ashgrove Kitchen & Bath is a fictional kitchen and bathroom remodeling company created to demonstrate QuoteStage. In a real estimate, this is where the contractor describes who they are, how long they've worked in the area and how they run a project.
- License
- General contractor license GC-DEMO-0000 (fictional number for demonstration)
- Insurance
- General liability and workers' compensation certificates available on request (demonstration text)
- Warranty
Sample warranty for the fictional demo company: 2-year workmanship warranty on the renovation. Cabinets, counters, fixtures and appliances carry their manufacturers' warranties.
- Service area
- Denver, Arapahoe and Jefferson counties, Colorado
Documents
As Ashgrove Kitchen & Bath provided them.
- Certificate of insurance (sample)View Certificate of insurance (sample)
- Contractor license (sample)View Contractor license (sample)
Terms
- Prices valid until
- December 14, 2026
- Payment schedule
- 10% when you sign the agreement
- 30% when cabinets are ordered
- 30% at rough-in inspection
- 25% when counters are set
- 5% at final walkthrough
- Changes after signing
- Selections are final when you approve the design. Any later change, including a selection that costs more than its allowance, is written up as a change order with its price before we order or build it.
- Please note
Allowances are budgets inside the price for items you'll pick later. If your pick costs less, you're credited the difference; if it costs more, the difference is a change order you approve first.
Ready to go ahead?
Send your selections to Ashgrove Kitchen & Bath. They'll contact you to confirm the details and prepare an agreement. Sending this doesn't commit you to anything.
You’re sending$78,900
Signature package; Cabinets: Painted white; Countertop: White quartz; Backsplash: White subway, 3 × 6 in; Hardware: Polished nickel; Flooring: Natural oak plank (luxury vinyl).